The challenge
Maintenance work-order requests ran on email. Under GMP (Good Manufacturing Practice) regulation that is a traceability problem: there was no reliable record of who asked for what, who approved it, or what changed in between.
The client needed numbered requests, four request types, a quality assurance (QA) approval gate, an audit trail, role-based visibility, notifications, a printable A4 form for wet signature and a dashboard.
What we built
We built the system on SharePoint against a written scope and a signed functional specification, tracing every requirement to its implementation and test scenario. Nineteen client decisions are recorded with their dates and rationale.
A ten-state status model, shared by every screen, covers four roles and two routes: unscheduled work passes through a QA gate, while three other request types bypass QA, as confirmed by the client.
PDFs are generated from the data and filed automatically at handover. A capacity issue that would have stopped the requester dashboard working within about fifteen months, as request volumes passed SharePoint's list limits, was found and fixed before go-live.
Outcome
Independently reviewed and hardened before client testing. A new site shows only what the signed specification describes; additional features sit behind switches an administrator can turn on without a new release.
Client acceptance testing then drove a series of refinements, and the notification and lock-on-handover Power Automate flows were packaged into a deployable solution.